Turnkey Machinery Relocation
A complete relocation scope: survey, dismantling, transport, installation and commissioning delivered as one coordinated project.
A plant relocation is not a series of separate jobs. When dismantling, transport and installation are bought from different suppliers, each one protects its own schedule and the gaps between them become downtime.
We take the whole scope: survey both sites, plan the sequence, dismantle and pack, transport, install, reconnect and support commissioning. One schedule, one point of contact, one team responsible for the result.
The sequence is built around how much downtime you can accept. Where production must continue, machines are moved in groups so part of the plant keeps running while the rest is transferred.
Scope of Work
- Survey and relocation plan
- Dismantling and packing
- Transport and logistics
- Installation and alignment
- Utility reconnection
- Commissioning and handover

Project Enquiry
Send the machine details and site information.
We review weight, access and destination conditions, then respond with a working method and a clear quotation.
+86 13816222647One Plan Across Both Sites
The plan covers the order machines leave, how they are loaded, the sequence they arrive in and where each one is placed. Layout drawings and utility positions at the destination are confirmed before the first machine moves.
Factory and Plant Transfers
- Complete production line transfers
- Single-hall layout changes
- Moves to a new industrial building
- Equipment transfers between cities
- Decommissioning of the old site
Downtime Under Control
Machines are grouped so installation at the destination runs in parallel with dismantling at the source. Critical equipment is scheduled first, and the restart date is tracked against the agreed plan.
Relocating a Factory or Production Line?
Share the machine list, weights and the dates for both sites. We will build a relocation sequence and confirm the crew and equipment needed.