
Factory Relocation Services
Complete factory relocation services for manufacturers moving production equipment, lines and utilities to a new facility.
A factory relocation is more than a series of machine moves. It is a production transfer that has to be sequenced, documented and supported by the right equipment at every stage.
We plan the whole transfer with your team: which equipment moves first, how foundations and utilities are prepared at the destination, and where production can restart earliest. Dismantling crews, transport and installation crews are scheduled against that same plan.
Because one team handles dismantling, moving and installation, hand over points that normally sit between contractors are managed inside the project. Problems are resolved on site rather than becoming disputes between suppliers.
Turnkey Project Management
One project manager, one schedule and one point of contact from the first survey to the final handover. You receive progress updates against the agreed plan, not a list of separate subcontractor reports.

Typical Scope
- Production lines and standalone machines
- Machine foundations, anchoring and grouting
- Mechanical and electrical reconnection
- Internal handling and site logistics
Our Factory Relocation Process
Site Survey & Project Planning
We assess both the existing and the new facility, list the equipment, check access routes and agree the transfer sequence.
Dismantling & Labeling
Machines are disconnected and dismantled in the agreed order, with components labeled, documented and packed for reassembly.
Transport & Site Logistics
Loading, haulage and unloading are scheduled to match site access, crane or forklift availability and the agreed production window.
Installation & Alignment
Equipment is positioned on prepared foundations, leveled and aligned before anchoring and grouting are carried out.
Reconnection & Commissioning
Plant services are reconnected and we support testing and commissioning alongside your engineering team.
Handover & Documentation
Final checks, documented handover and production-ready equipment, delivered on the schedule agreed at the start.
Relocating a Complete Facility?
Share your equipment list and target schedule. We will outline the transfer sequence, resources and timeline for your project.